AST SpaceMobile: Blacklift Rocket With Firefly Explained
This AST SpaceMobile Podcast episode is a solo breakdown by Anpanman of a surprise same-day announcement: AST SpaceMobile is partnering with Firefly Aerospace to jointly develop a dedicated 20-ton rocket called "Blacklift," designed to carry up to 5 Bluebird satellites to low Earth orbit.
Anpanman walks through the deal terms as he understands them (roughly $1.3 billion total, split across upfront cash/stock, engine deliveries, and engineering services), explains that AST is licensing Firefly's already-tested Miranda engine rather than starting from scratch, and flags a likely slip of the targeted end-2028 first flight into 2029.
He argues the deal is really about assured launch access: AST has secured launch agreements for 100 satellites across 2027-2028, just received a DPAS government-priority rating, and saw an expanded Space Force radar/sensing award the day before. He frames this alongside global government and carrier demand for Starlink alternatives, and runs through build-versus-buy launch economics.
The headline conclusion is that Anpanman sees this as a long-term, strategically sound but genuinely risky bet that trades near-term dilution and execution risk for owner economics and launch certainty, with more detail expected at earnings on November 9, Firefly's call on November 10, and a New York press event on November 12, 2026.
Key Takeaways
- AST SpaceMobile announced a joint-development deal with Firefly Aerospace on November 6, 2026 to build a dedicated 20-ton rocket called "Blacklift," designed to carry up to 5 Bluebird satellites to low Earth orbit.
- Anpanman estimated the deal at roughly $1.3 billion total: about $400 million in cash plus 10-14 million AST shares (collared to a 30-day forward VWAP) as upfront consideration, about $250 million for engines covering the first 3 rockets, and about $250 million for engineering services over 3 years; he flagged some of these figures as rough since he assembled them quickly the morning of the episode.
- AST is licensing Firefly's existing Miranda rocket engine technology, which has completed 175 hot-fire tests, rather than developing an engine from scratch.
- Blacklift is intended to be fully reusable and purpose-built solely to deliver Bluebird satellites to LEO — not a general-purpose rocket for other missions or customers.
- A first Blacklift flight is targeted for the end of 2028, but Anpanman expects this to slip to 2029.
- AST has secured launch agreements for 100 satellites covering 2027 and 2028, and has newly obtained a DPAS (Defense Priorities and Allocation System) rating that gives qualifying satellites priority launch access ahead of commercial cargo.
- The day before this episode, AST announced an expansion of a Space Force award for radar and sensing work tied to earlier 900 MHz testing.
- Anpanman speculates the rocket's name, "Blacklift" rather than "Bluelift," hints at a future dedicated "Blackbird" shell of US government satellites distinct from the commercial Bluebird constellation.
- Anpanman frames rising demand for orbital data center compute as a key reason launch capacity has become more constrained and strategically important than it seemed in 2022-2024.
- Anpanman's own rough math suggests current launch costs run about $160-170 million for 2 Falcon 9 launches carrying 6 satellites, and he speculates (not company guidance) that an in-house Blacklift rocket could eventually push launch costs per 5-satellite batch down toward $20-30 million.
- AST's architecture is described as "bent pipe," meaning local mobile network operators (or foreign/sovereign constellations when applicable) control satellite shutoff over their territory, which Anpanman contrasts with concerns about a unilateral Starlink-style kill switch.
- Key upcoming dates: AST's earnings call on Monday, November 9, 2026; Firefly's own earnings call on November 10, 2026; and a joint press event in New York City on November 12, 2026, where more deal and economics details are expected.
Detailed Discussion8 topics
The AST-Firefly Blacklift Deal
8
-
AST SpaceMobile is building its own dedicated 20-ton rocket, called Blacklift, in a joint development/engine-licensing arrangement with Firefly Aerospace, designed to deliver up to 5 Bluebird satellites to LEO; the deal was announced the same day as this episode.
-
As he understood the terms (assembled quickly that morning, so flagged as somewhat uncertain): roughly a $1.3 billion total deal, comprising about $400 million in cash plus 10-14 million AST shares (collared depending on a 30-day forward VWAP of AST stock) as upfront consideration, about $250 million for 36 engines covering the first 3 rockets, and about $250 million for engineering services over a 3-year period.
-
Restated later that the upfront consideration (cash plus stock combined) is about $800 million, with the engine-delivery figure later referenced as covering 38 engines rather than 36 — Anpanman treats the exact split as uncertain pending the formal 8-K/10-Q disclosure.
-
This is a joint-development arrangement riding on Firefly's already-advanced program: AST is licensing Firefly's existing Miranda engine technology, which has completed 175 hot-fire tests, saving what he estimates would otherwise be a 10-plus-year engine design cycle, while also benefiting from Firefly's broader R&D and developing some of its own IP.
-
Some rocket-body and other design work will be outsourced to Firefly under a 3-year engineering services support agreement, with additional development happening internally at AST; Firefly in turn benefits from AST's investment advancing its own rocket program, which otherwise focuses on commercial cargo.
-
Blacklift is intended to be fully reusable, with a possible first flight by the end of 2028 that Anpanman personally expects will likely slip to 2029, drawing an analogy to delays on Rocket Lab's Neutron program.
-
The rocket will have one job only — delivering Bluebirds to LEO and returning — not a general-purpose vehicle for Moon/Mars missions, and AST is not opening it up to outside commercial customers.
-
He speculates the name "Blacklift," rather than the more on-brand "Bluelift," hints that the vehicle may eventually also launch a dedicated "Blackbird" shell of US government satellites, separate from the commercial Bluebird constellation, and that "Blue" was likely avoided to not collide with Blue Origin's branding.
Why Assured Launch Access Matters
2
-
He argues the launch-capacity calculus changed with the rise of orbital data center/compute demand: through 2022-2025 launch capacity on Starship and New Glenn looked abundant, but growing orbital compute ambitions now compete for the same capacity, making assured access to space more strategically important for a company that has to deliver constellations on a committed timeline.
-
A company delivering multiple satellite shells to multiple governments and MNOs cannot be fully dependent on the cadence or continued friendliness of outside launch providers, especially if those providers might prioritize their own competing constellations.
100 Satellites Secured, DPAS Rating, and the Space Force Award
5
-
AST has secured launch agreements for 100 satellites across 2027 and 2028.
-
AST now holds a DPAS (Defense Priorities and Allocation System) rating — a World War II-era mechanism that gives priority queue access to programs for national security reasons, putting AST's satellites ahead of commercial cargo once an actual government program of record is awarded.
-
The day before this episode, AST announced an expansion of a Space Force award for radar and sensing, based on prior 900 MHz testing that Space Mob had been tracking for months.
-
He frames the DPAS rating and the Firefly deal together as evidence that larger government program-of-record awards are coming, citing the company's own commentary that 2027 defense-related revenue could reach several hundred million dollars.
-
He sees broad government demand not just from the US but also Japan, Europe, and Latin America to diversify away from Starlink as a key driver of AST's decision to self-fund launch capacity.
Build vs. Buy Launch Economics
4
-
He compares SpaceX's Falcon 9 sticker price (roughly $80 million) to its internal cost (roughly $13 million) as the rationale for pursuing owner economics on launch.
-
He estimates 2 Falcon 9 launches currently cost roughly $160-170 million total to deliver 6 satellites, and speculates — explicitly guessing, not citing company figures — that Blacklift could eventually bring the cost for a 5-satellite batch down to something like $20-30 million.
-
He speculates that current Block 2 Bluebird per-satellite cost (roughly $26-27 million, his own rough figure) could potentially fall to $18-20 million if launch costs come down with an in-house rocket.
-
Funding for Blacklift's development is expected to come partly from self-funding once commercial service ramps and partly from government contract revenue as DPAS-linked awards convert into larger programs.
Competitive Landscape and Global Demand
2
-
He notes rival and competing constellation efforts — Viasat's Space42/Equitas, and a European desire to develop something like "Iris Squared 2" (a Starlink fixed-broadband competitor, not direct-to-device) — alongside Japan's roughly $1 billion J-LEO sovereign satellite award and a broader European push for sovereign constellations, as evidence of surging global demand for alternatives to Starlink.
-
He relays that 45 satellites gets AST to US commercial service while 100 satellites gets to global coverage and full service, beyond which the company plans to densify the constellation with mid-band, high-band, and government-dedicated shells.
Deal Timing and Context
2
-
He does not think it was coincidental that the Space Force/SDA-related award came out the day before the Firefly deal was announced, viewing credible launch capacity as part of what's needed to win and deliver on government programs.
-
He acknowledges he previously misread prior convertible-note-offering language about AST "securing launch" as a hint the company might acquire a launch company outright; he now clarifies that language instead referred to this creative joint-development structure with Firefly.
Key Dates Ahead
3
-
AST's earnings call is scheduled for Monday, November 9, 2026.
-
Firefly has its own earnings call on November 10, 2026, which is expected to touch on the deal.
-
A joint press event in New York City is scheduled for November 12, 2026, where he expects more detail on financing structure and per-launch/per-satellite cost economics; he plans to attend in person.
Live Q&A
8
-
Asked whether AST will outsource most of the rocket to Firefly and whether it will be reusable: engine work is largely already done via licensing; rocket body and other design elements will be partly outsourced to Firefly under the 3-year engineering services agreement and partly developed internally; the rocket will be reusable.
-
Asked how a company that has struggled to produce satellites can be trusted to execute a rocket program, he argued the risk is mitigated because AST is leveraging Firefly's already-demonstrated rocket program rather than starting from scratch, though he called it a fair question; he also noted satellite production is not currently the bottleneck — getting enough launch is.
-
Asked whether the capex would be better spent on AI data centers, he responded that getting data centers to space requires launch capacity in the first place, so the investment supports rather than competes with that use case.
-
Asked about the launch pad: AST will have to build its own pad; location is undetermined, though he speculated Texas is possible.
-
Asked why AST wouldn't simply buy Firefly outright or use ULA's Vulcan instead: buying Vulcan would turn AST into a general commercial/government launch provider rather than operating a purpose-built, single-mission vehicle; he was unsure of Vulcan's underlying economics but felt a clean-sheet, Bluebird-only design made more sense.
-
Asked why AST didn't do this deal months earlier: he believes the timing reflects AST only recently gaining clearer visibility into Japan's roughly $1 billion J-LEO award and firming US government demand, which he believes also explains the funding raised in AST's last convertible note offering.
-
Asked how AST's approach mitigates concerns about a Starlink-style kill switch: AST's architecture is "bent pipe," so when satellites fly over a given country, the local MNO controls the satellite; for AST's own constellation AST retains control, while for flagged foreign constellations (e.g., a European or Japanese constellation) that country's operator would have the kill switch — a materially different control structure than SpaceX's approach.
-
Asked why AST didn't wait until earnings to announce the deal: he said the deal had to be disclosed once signed (via an 8-K), likely tied to the prior day's stock move, with fuller detail expected at earnings and the November 12 NYC event; he reiterated that dilution and funding concerns are real but that he expects Abel Avellan and the board see enough government and commercial business to justify the long-term bet.
Watch Items4
-
AST SpaceMobile quarterly earnings call
-
Firefly Aerospace earnings call (expected to address the Blacklift deal)
-
Joint AST-Firefly press event in New York City with more deal/economics detail
-
Blacklift rocket first flight
Open Questions4
-
What will the final funding/financing structure for Blacklift's development ultimately look like, and how much will come from government versus commercial revenue?
-
What will the actual per-launch and per-Bluebird cost be once Blacklift reaches operational cadence?
-
Where will Blacklift actually launch from, and will AST need to build an entirely new launch pad?
-
Will AST eventually design a fairing larger than 5 meters to accommodate bigger future satellites?
Raw Transcript
Show full transcript
[00:00:01] Speaker A: Are you ever shopping online and suddenly a discount that helps you save pops up? It makes your day, sometimes even your week. Want that feeling month after month? Well, new customers who save by switching their home and auto insurance to Progressive save hundreds. Cue your happy dance. Get your quote today at progressive.com. Progressive Casualty Insurance Company affiliates and other insurers not available in all states. Progressive. [00:00:28] Speaker B: This episode is brought to you by Google Chrome. You think you know a browser, but Gemini in Chrome? That's new. It can help you with practically anything on the web, like restoring a vintage motorcycle from a 50-page restoration blog, or finally break down that long article you've had open for weeks. Gemini in Chrome is here for it. Ready to make anything online make sense? There's no place like Chrome. Check responses, setup required, compatibility and availability varies, 18+. [00:00:54] Speaker C: Everyone, thanks for joining. For some reason on X, I can't see participants, but I've been told that, that it is working, so I'm just going to go ahead here. Um, yeah, big news today. Um, I wanted to cover it and provide some thoughts. I also, for people's edification, uh, I did speak briefly to the company, and I believe there will be a lot more details. There's going to be a big press event next week in New York, um, which I'm planning to attend. Uh, I think hopefully they'll invite, you know, broader space mob, whoever is in New York. Um, but yeah, big news today. So AST is building their own 20-ton rocket to deploy Bluebird satellites into LEO, and they entered into a partnership or an agreement, um, or joint development. I, I don't know how you would classify this, but they're paying Firefly, I think it's— I apologize. This morning I was taking kids to school and was running around. So I tried to put together as much of the details as I could, but it's about a $1.3 billion deal where they are spending about $400 million in cash and then $10 to $14 million of AST shares. So there's a collar there. Depending on where AST stock price closes on a 30-day forward VWAP. It could be less shares or it could be more depending on where that range is, which we'll probably find out when an agreement is 8-K'd or— well, I don't know if it's— well, it should be at least in the 10-Q. There's also $250 million for 36 engines for the first 3 rockets and then $250 million for engineering services over 3 years. The key thing here is that AST is doing this in joint development, right? So they're riding on a program that's already been cooking, that's further along, obviously, Firefly. They've had 175 Miranda engine hot fire tests, and they will be leveraging all the development work that they had. They will also be licensing the the existing technology, the engine technology, so that they obviously don't need to develop that themselves. I think it's a— the design timeline for engines is somewhere along the lines of, call it 10 years or more. And so this accelerates that. But then beyond that, they will be benefiting from Firefly's R&D. And then of course they'll be developing their own IP as well. People who understand rockets understand that the engine is the most critical and the most difficult thing to do. And then for AST, they will be leveraging learnings and what have you to develop what they believe will be a fully reusable rocket, maybe the first flight by the end of 2028. So let's probably push that back to 2029. I think, obviously the company did this because they are looking down the barrel of a bunch of demand for what they're doing. And as a result, they need to secure launch, right? There needs to be an ability to tell customers that in the future, when you have multiple shells that need to go up, you can deliver on that, right? And so interestingly, I pointed this out in a tweet, this rocket's gonna be called Blacklift. It's not gonna be called Blue Lift. The reason why I think personally they're calling it Blacklift is that there's probably gonna be blackbirds, right, for US government work, whether it's dual use with an existing commercial satellite or a dedicated shell of government satellites, which I think now it all kind of makes sense. I believe, you know, we have another 400,000 square feet in Midland that got approved for expansion. Putting aside the 500,000 square feet we already have for satellite production, my guess now is that additional space is going to be dedicated to more satellites, but also rocket development. But going back to what I was saying before, why would the company do this? And of course, when I first saw this, some space mob, we've been digging around and were getting hints that maybe this was something, possible. And so we debated what was the purpose of it. And of course, when it hit the tape today, we were of course surprised. But I think when you take a step back, there's a lot of questions here, by the way. There's certainly risk, and I'll go through those. But when you think about the long term of what the company needs to do and deliver, you need assured access to space, which I think Going back to 2022, 2023, 2024, all those years, and for most of 2025, I think the view on launch capacity was pretty positive. But it wasn't until the advent of orbital data centers came into play, where now there's this focus on putting compute into space. Now capacity looks not as interesting. Right. rights to space could be constrained to some extent. So you, as a company, if you're delivering a program that's in demand by MNOs globally, by governments, there's a lot at stake. So I think the idea that Starship and Blue Origin New Glenn are going to launch on a weekly and monthly basis, or monthly, weekly, and then day-by-day basis. I think that's a really interesting concept and hopefully they'll get there. But also, if you're a company that needs to deliver a constellation and multiple constellations on a given time, you can't be kind of at the whims of those rocket programs getting there and/or they continue those programs being friendly versus trying to put up a competing constellation. And so I think with all those things in mind, having the ability to bring a program in-house and create a dedicated vehicle just for— a simple vehicle, if there ever is a simple rocket, but one that's not configured to go to the moon or go to Mars, but its sole job in a cost-effective way is just to deliver your satellites to LEO. And so I think it's interesting to point out that the company is, this is not a rocket that they're not looking to open this up to customers or any of that. And you can see that with Firefly where they're not competing. There's so much demand that they need it for their own satellites, which is a good thing. And so— [00:08:02] Speaker A: Life is all about making decisions. Sometimes you make questionable ones, like buying a new TV that's too big for the wall because the electronics store employee was a little too good at their job. Then sometimes you make great ones, like protecting your home and auto with Progressive. You get customized coverage options so you can be sure you have the right coverage. Get your quote today at progressive.com. Progressive Casualty Insurance Company affiliates and other insurers not available in all states. [00:08:32] Speaker B: This episode is brought to you by Google Chrome. You think you know a browser, but Gemini in Chrome, that's new. They can help you with practically anything on the web, like restoring a vintage motorcycle from a 50-page restoration blog, or finally break down that long article you've had open for weeks. Gemini in Chrome is here for it. Ready to make anything online make sense? There's no place like Chrome. Check responses, set up required compatibility and availability varies, 18+. [00:08:57] Speaker C: The company taking this move, from what I understand, it has been in the works for quite some time. And I think the messaging previously is that, you know, they obviously are gonna leverage multiple launch vehicles, which they will continue to do. I think an important aspect from this press release is that they have secured launch for 100 satellites over 2027 and 2028. The other interesting thing that I would point out is they now have a DPAS rating. And so this is very important. For those that don't know, this is something that Cook had been talking about. He was actually talking about a different program, but it's similar, where he was saying maybe AST will get an NSSL rating. But here we are now coded for Defense Priorities and Allocation System. This is something that is an act that was developed over World War II, and it gives priorities to programs for national security reasons. And so we actually have that now. And so why that is important is that for these 100 satellites from 2027 to 2028, once we do get a government program of record where the government says, hey, we want your services and here's money, not just some initial exploratory stuff, which the company has multiple programs that are in the works, but the company now, by getting this DPAS rating, The US government is basically telling you, you're in line to get award work. And when you do, a DPAS rating means that your satellites go to the front of the queue ahead of commercial cargoes. And so you obviously need to get an award for that, but now that we have a rating, I think that pretty much tells you that those awards are coming. Yesterday, we announced this expansion of award for radar and sensing. with the Space Force. And so that was based off of 900 MHz testing that we had done. Space Mob had covered that over the last few months, but things are accelerating, right? And so from what I understand, there's a lot of support in the US government and you wouldn't take on trying to develop a rocket, obviously, in partnership with Firefly, but you wouldn't do that unless you felt confident that there's a lot of big work that's coming, that's going to be funded, and you expand floor space. I think, as we all know, the US government, and this holds true too, it's not just US, but it's also Europe, Japan, Latin America, everybody is looking to diversify and have options away from Starlink. So If anything, I think this is probably the most explicit hint of that, because the company, if you think about their ability to go to governments beyond the first 100 satellites where things are, they can be uncertain, you have to have the ability to go to governments and MNOs and say, Hey, we are confident in delivering these satellites to space. And if you're going to do a low-band shell, a mid-band shell, a high-band shell, and then a government shell, that's a lot of satellites. And so it does make sense if you're thinking about the future to invest in capacity where you get owner economics and you have more importantly the ability to, or just as importantly, to deliver on what you say you are. instead of being at the whims of, in SpaceX's case, if there's certain things that they want to do and it's not compatible with what commercial companies want or NASA, you're not at the whims of just one provider. The other thing is that this gives them the ability to then, when you negotiate with launch providers, enables you to have a bit more leverage. Now, obviously that leverage is— it increases a little bit today, but then maybe a year, 2 years from now, it'll increase further. And this is an option, right? This is an option where it's not as if you're building a rocket from scratch. You're actually writing the already laid out development plans from another company and you're putting money into that, you're helping them, and you're getting to the pad faster. And in this particular case, you're building a rocket that's purpose-built. It's not designed to take other payloads, but it's gonna be solely for your satellites. So as I was saying before, I think the dynamic that changed for the industry is putting orbital compute into space. And so One of the things that I think SpaceX had— the issues that SpaceX had had before was that when they had first developed their rocket, there was no cargo to take up to space. So then they had to expand into Starlink and creating their own cargoes. Well, now that you have orbital compute, that's a pretty big level of demand. Right. And so I think That uncertainty, and then coupled with the fact that you've, again, you've got governments around the world who want alternatives, MNOs as well, you have to have the ability to get your satellites to space, whether that's through the launches for 100 satellites that are contracted over the next 2 years, which this company has locked in, but also developing a program in parallel, which will de-risk your ability to get more satellites up. Let's see here. I'm gonna talk about, go through some of these notes. So as I mentioned before, this Blacklift is gonna be a simple design. There'll be no other mission except for delivering Bluebirds to low Earth orbit. It's not gonna be a rocket that is designed to go to the moon or to Mars. It has one job and one job only, to deliver Bluebirds to LEO and then return. Let's see. As I mentioned before, the company is piggybacking development already that has been invested by Firefly. They're licensing IP to make engines. And yeah, I mean, that's the most difficult part. Now, the risk, of course, let's talk about some of the issues. The risk is that we know rocket programs are difficult. They take time. and they also require money. And so we are paying upfront money for the IP and ongoing services and development, but it's going to require money over time. And so a key question that I think people have is, where's the money coming from? And so I think the key thing is that once you get service up and running and you've got with the existing launch agreements to get 100 satellites to space, then things start to become self-funding. And that's part of it, but that's going to take time. The other aspect is if you're getting a DPAS rating for the government and you're getting these awards, sooner or later, those awards are going to turn into multi-hundred to potentially multi-billion dollar programs. I think the company has talked about defense this year potentially being several, or this coming year, 2027, being several hundred million dollars. And so I think putting aside, or I guess we should talk about the political landscape too. I think there is going to be a big push to diversify, look at different providers that are alternatives to SpaceX, and specifically for Starlink and Starshield. And so I think the funding for this program is likely over time going to be subsidized by government work. So yes, it is a constraint, but I think the— I got to run through the model for this, but you do have to think about the upfront development costs and the ongoing, but then weigh that against So it's going to cost money to develop a rocket, and this is the build versus buy analysis. But on the flip side, you get owner economics. So if Falcon 9 costs sticker price now, what, $80 million, but internally the cost is $13 million, how much do you save per launch? And so it'll be interesting to see, maybe they'll cover this at the presentation next week, but what ultimately is going to be the potential cost per per launch. And then, I guess one key question I would have is the Bluebird, right? Once you're beyond the upfront cost, does the cost per Bluebird, does that materially change? Does it go from, I don't know, let's just call it like $26, $27 million for Block 2 Bluebird, does that go down to $20 or $18 or $19? So yes, there is money that's gonna be required to develop the program, but then on an ongoing basis, in terms of variable costs, how much do you lower the cost of launch for each Bluebird? And so that'll be an interesting question. But yeah, I think the ability to have line of sight for launch beyond 2028, to have— by the way, I don't think the company is going to fully depend on this Blacklift rocket for all their launches. If you think about what Amazon is doing, where they are launching on SpaceX, they're launching on ULA, and of course Blue Origin. The view is to have a diversity of launch, right? So where you're not fully dependent on one provider and you also have the ability to negotiate better prices, right? And so I think for 2028, 2029, 2030, I think AST, hopefully by that time the rocket will be launching, there'll be some level of cadence, which is going to take time, but during that, but having that as an option and ramping that up in addition to other commercial launch providers, I think will be important. And of course, going back to what I was saying before, having a DPAS rating should get them, for the satellites that have dual use or are government-focused, that will put them to towards the front of the queue for launch, whether that's on SpaceX or Blue Origin or ULA or whatever rockets there are. But yeah, this is a big announcement. I think it's probably going to take people time to digest it. For some people, candidly, it may not be for them. It's like another— it's on the one hand, you're de-risking certain things. On the other hand, you're turning up risk in other areas. And so it may not be for people, but I would say one of the biggest concerns that people have had is launch. And one of the biggest criticisms of the company is that launch is a problem. And so as a long-term strategic thinker, and if you're investing for the long term, do you take that risk? And so the company has chosen to take that risk and yeah, they're addressing that issue and they're hoping to put that to bed. and have more certainty for the future of the company. And I think from a competitive standpoint, the interesting thing is that you've got a whole host of people that see what AST is doing and they're trying to develop competing constellations. For example, Viasat has talked about Space42 or Equitas, and there's other, in Europe, there's a desire to develop Irisquared 2, which is actually a competitor to Starlink, the fixed wireless business, not directed advice. But if you can imagine, like in Japan, we're getting this billion-dollar award and there's this desire to put up a sovereign constellation in Europe. There's also a desire to do that as well. There's a lot of demand, right? And there's only going to be, in terms of guarantees, the ability to say to your customers that we can deliver this constellation on this date, you need to have the ability to underwrite that in a more confident way. And so I think because of all the demand they're seeing, whether it's governments, US government, Japanese government, Europe, whether it's MNOs, T-Mobile, Verizon, AT&T, they all want an alternative. And if you can't get it up to space, then that's a problem. And so going beyond this 100 satellites, which 45 gets us to commercial service in the US, 100 gets us to global coverage and full service. And then beyond that, densifying the constellation for mid-band and high-band satellites, and then government shells as well. This is kind of the long-term evolution of what you need to do. And Firefly, from what I understand, the company has known the folks at Firefly for a very long time. This is something that apparently was in the works for a long time. As we saw in the last convertible offering, I was wrong. When we saw that wording about potentially looking at, I think the wording was something along the lines of securing launch. In my mind, I was like, I don't think they're looking to buy launches. I don't think they're looking to buy a a launch company, which was true, but what they did do is they entered into a creative structure, which they hinted at, that allows them to secure launch, which means that they're piggybacking development that's already far along and they're creating their own vehicle. And so yeah, that's kind of where we are. Let me just look at— let me see if there's any other things in my notes here. Yeah, I think one important thing, you know, this— I don't think it was a— I don't think it was by happenstance that the SDA award came out yesterday and then this deal was announced today. From what I understand, there's been a lot of government interactions with the company, and I think part of the Part of the ability to deliver on these government programs, again, is to have a credible launch plan, which includes other commercial launch providers, but I think solidifying that is developing your own launch capacity as well. And so when people again ask, how is this program going to be paid for? I think a decent amount of that, in my mind, is probably going to come from the US government. And the work that they're doing. But let me see here. So yeah, we've got earnings on Monday, November 9th, and then Firefly has a call on November 10th. And then there's this event that's going to be happening on November 12th in New York City, where they're going to talk about this in more detail, which I'm planning to attend personally. Hopefully I'll get invited. But yeah, that's pretty much most of what I had. Let me just look and see if there are questions. Let's see. Yeah, one thing I think I talked about in the space earlier, but I think the name Blacklift is very specific in keeping with company nomenclature. I would've assumed it would've been Bluelift, but actually, You know, I take that back. Of course there's Blue Origin. So you don't wanna use blue, but I do think Blacklift does hint at what ultimately is gonna become some government programs, which will be Blackbirds. Let's see. Someone's asking, does this mean AC will outsource most of the rocket to Firefly? How do we finance this? And who will do the rocket body and will it be reusable? Okay. Yes, we— well, a lot of the work has already been done, right, on the engines. A new body and other aspects of rocket design will— some portion of it will be outsourced to Firefly, right? Because there's a joint— let's see, there's an engineering services support over a 3-year period, but there's also going to be— In— Sorry, there's going to be development internally. Right? And so it will, but for all intents and purposes, Firefly will benefit too from having, working with AST to further along their own rocket program, which they are focused on commercial cargoes, but this rocket that we are developing will just be focused solely on Bluebirds. And as I mentioned before, it will have the ability to take up to 5 Bluebirds to lower Earth orbit. So how do we finance this? Well, we've already, There's an $800 million cash upfront consideration, $400 million in cash, and then 10 to 14 million shares as determined by forward VWAP. And then over time, there'll be $250 million paid for delivery of, I think it was 38 engines, and then— or sorry, engines for 3 rockets, and then $250 million over a 3-year period for engineering support services. When asked about, you know, how are we going to pay for development in general? Well, I think it's important, you know, the line of sight to government and commercial work gives a company confidence enough where they feel like they can fund this. Let's see. But I think my guess is we will hear more about what the total funding will look like over time, and then that overtime meaning in the presentation on November 12th, they'll probably lay that out. And then I think also importantly, understanding what the economics are. So once the rocket gets up to some level of decent cadence, what is the cost of that? So I don't know if it's $20 million or $30 million, you're launching 5 Bluebirds, that's pretty huge savings versus What, for Falcon 9, 2 Falcon 9s for 6 satellites cost in total, I think it's like $160, $170 million. So if you can cut that down to, for 5 satellites, let's say, I'm just making numbers up, but if you could do that for eventually $30 million, then the savings over the long run are going to be pretty tremendous. Let's see. Someone's asking, how can we trust this new initiative when they can't even produce SATs? Okay, that's a fair question. Yeah, all this stuff is hard, right? And so you've got to ask yourself the question, can you trust this new initiative? I think the company could pull it off, but it's going to take time, right? And if they were doing this from scratch, then I would be very concerned, but they're not, right? They're doing it with a company that's already demonstrated successful rocket launches, and now they're taking on this program to develop a larger rocket. But that's a fair question. I mean, it's a question that folks should ask. I mean, I think when we get an update on production on Monday, from what I understand, production currently is not an issue. Right now, it's making sure that we can get enough launch. So take that for what it is. Let's see. Wouldn't AI data centers be better use of this CapEx? Well, that's— yeah, it could be, but if you can't get the data centers to space, then what's the point? I think for the company's perspective, the core mission is to get Bluebird satellites up to space and to launch a service. Anything that accelerates that and de-risks it. Accelerate means moving beyond just one shell, but 2, 3 shells, and then de-risking, meaning while you still are going to engage with commercial providers, like they've demonstrated, they've locked in 100 launches for the next 2 years, you still want to have the ability to not have to rely on others. Let's see. Timeline. This will not come before 2030 at a minimum. Yeah. That's certainly possible. If they can get a first launch in 2028, at the end of 2028, great. If it's 2029, I mean, my guess is it probably, you push that back. I mean, just look at what Rocket Lab is doing with Neutron. But I think part of this too is having the option. It's almost like an option value too of making sure that If New Glenn and Starship are, if they say what they're gonna do, which is, we're gonna launch eventually every day, then maybe everything is solved, right? But as we all know, space is hard and this stuff takes time. And so I think making sure that you have the ability to have options, I think is important. Let's see. What pad will they use to launch? Well, they will have to build a pad. So let's see here. Let's see. Firefly hasn't delivered on their own rockets, and so they're going for AST. Yeah, red flag. Well, yeah, it's possible. I think my guess is the company, given their level of due diligence and what they've seen, they must feel pretty good about it. So we'll see. Let's see. I'm just going through some of these comments. Why wouldn't you just buy Firefly outright and why not do this months ago? I don't think a deal— So my guess is when they raised the money back in, was it August? The deal was in the works, right? And I think probably you wouldn't do this months ago if you didn't have line of sight to government work, right? And a lot of things have evolved, right? So let's go back. So a few months ago, they didn't know if they were going to get JLEO. Europe was still kind of percolating, and for US government work, they still had to do testing, right? And so what do we know now? There's JLEO with $1 billion. There's US government work that's clearly unfolding and sizing up. And so that's probably why they're doing this now, because they have a better perspective of, yes, they need more launch and the ability to deliver. So could they have done it in May, April? Maybe, but based off of the money that they raised in the last convert, that kind of told you that finally things were getting to a point where They were negotiating and getting this thing done. Let's see. Someone's saying this opens the door for AST also compete for different government contracts. Yes, I think that's right. Someone's asking, is this a reusable rocket or fully consumed upon launch? This will be a reusable rocket. Let's see. At first read, I don't like it. After some digestion, it could make a lot of sense longer term. I remind myself in Abel and all other shareholders are diluted as well, so they must understand the net impact is positive. Yeah. Abel is thinking about this long term. And so when considering the strategic landscape and the ability to ensure that your constellation goes up when you want, I think he viewed this as a long-term solution. Let's see. Someone's saying, what are the costs come along with this, such as engineering, launchpad, and additional operating costs? Going to be extremely expensive, but maybe worthwhile considering their projected launch costs. Yeah, this is the— so that's the calculation, right? What is it going to cost you in terms of upfront engineering, you got to build a launchpad and ongoing operating costs in exchange for what could be very low projected launch costs. So if you think about the company, I think the most expensive CapEx for the company from here into the future is launch. And so the next kind of thing, if you are running a company that's focused on delivering data at a very cheap price, one of the key things you want to do is tackle your biggest expense items. And so if launch is one of your biggest expense items, you pursue that by developing a rocket and de-risking the development of that because you're entering into somebody who's doing it already. But then also an important thing is you, as part of that, you're You're reducing the cost per rocket and you're taking a big piece of expense out. But the other benefit of that is if you have a rocket, then you're still going to be in the mix to utilize these other vehicles, but you also have leverage. You're not at the whims of someone who might say, well, you're going to have to pay more, or the concerns that people have expressed over time. Maybe they cut you off for a while or they make you pay more, which is anti-competitive behavior, but there's little things here that you can do on the margins where maybe you make it a little tougher for your customers. So I think this approach, it makes sense and it's a bet to diversify and tackle what ultimately is your biggest cost item over time. Let's see. Do I think they will design a fairing bigger than 5 meters to accommodate larger future satellites? Yeah, I think it's possible. I mean, look, let's just take baby steps. They're focusing on delivering a— or hopefully developing a rocket that can deliver 5 Bluebirds up to space, but then Beyond that, could they develop a bigger one? Maybe, but let's focus on the first one. Someone's asking, why not buy Vulcan? Well, Vulcan is an important government launch vehicle. I think there's a whole host of issues that potentially come along with that versus doing something that's clean sheet. And so if you buy Vulcan, then you basically are a commercial provider, right? You're gonna launch other people, you're gonna launch the government. It's a good question. I'm not sure what the economics are of Vulcan, but I don't think you wanna buy Vulcan. You want to use them as a launch provider and develop something that— I think an important aspect here is that this rocket is designed specifically for one mission, one mission only, and that's to deliver Bluebirds to low Earth orbit. And so you try to make it as simple as possible. Let's see. Someone's saying, I hope the program is solely intended for BB use, not commercial use, which is less economical. Yes, that's right. This is going to be solely for Bluebirds. Would the first stage and second stage be produced in Midland, Odessa, and ASTS facilities? I think that's where the new 400,000 square foot, some portion of that facility will be used for this. So that's why I'm guessing they've expanded because everyone was scratching their head. They're like, oh my gosh, they're expanding. They got this new 400,000 square feet approved by the city. Do they really need that much more space for building Bluebirds? Well, now we know why. Let's see. Someone's asking about where the rocket will most likely be launched from. That's a good question. I'm not sure. I think we will learn more next week. If I just throwing some random stuff out there, I mean, could it launch from Texas? Could they develop a pad there and make transportation easier? I guess it's possible. I don't know. Let's see. Someone's asking, can you explain how the issue of Elon shutting off Starlink is mitigated by AST's approach? Can't they turn off their satellites just like Elon? So in AST's approach, it's a bent pipe satellite. And so when it's over, the way that the architecture works is that when it's over another country and is used by the MNOs there, they have control of the satellite. Well, there's a few approaches. One would be we still control the satellite, or if we have another constellation which is flagged by— is a European constellation or a Japanese constellation, they would actually have the kill switch. Even with our constellation, when it's over Europe, they will have the ability to control it. So that's quite a bit different than what Elon is doing. Let's see here. Someone's saying, layers of execution risk aside, as well as possible payoff of being vertically integrated, I guess this pretty much well narrows the possibility space on an acquisition of any kind to Meta, Google, and MNO JV. It also leans to Abel wanting the whole enchilada, not part. I think those are good Good observations. Let's see. Someone is asking, where will the money come from? I'm really afraid of dilution and what might be coming here. AST was already a risky business, but this is just insane. So yeah, I think for people who are concerned, they're definitely— so it takes one risk off the table to some extent, and then it introduces more risk. And yes, it will need to be funded over time. And so the question is, as a management team, as Abel, who is the largest owner, does he see enough business on the government side and the commercial side to fund this program? And the answer must be unequivocally yes. Let's see. [00:41:11] Speaker A: Progressive's Accident Response can contact emergency services if you're in a major accident. The only thing worse than someone you love being in an accident is not being able to help them. So Progressive is here to help when you can't. So get peace of mind knowing your loved ones are protected with Progressive's Accident Response. Learn more at progressive.com. Progressive Casualty Insurance Company and affiliates, limited availability in California. Driver is responsible for emergency and towing charges not covered by the policy. Coverage subject to policy terms and conditions. [00:41:41] Speaker B: This episode is brought to you by Google Chrome. You think you know a browser, but Gemini in Chrome? That's new. It can help you with practically anything on the web, like restoring a vintage motorcycle from a 50-page restoration blog, or finally break down that long article you've had open for weeks. Gemini in Chrome is here for it. Ready to make anything online make sense? There's no place like Chrome. Check responses, setup required, compatibility and availability varies, 18+. [00:42:06] Speaker C: Someone's asking, do you think there's a reason why they didn't wait until earnings to announce this? Could it be yesterday's drop? I think they inked it, when they inked the deal, they had to AK it, right? So it got announced, I mean, it must've got signed recently. So I think they probably want the market to digest this to a degree, and then they'll have the ability to talk about it during earnings and also next week during the presentation. Let's see. Do you expect government funding for this? Yeah, I do. I expect there to be government awards that maybe were predicated on making sure that they had launch, which they signed for 100 satellites to— MLAs for 100 satellites over the next 2 years, but then this also putting this into the mix for 2028, 2029, and beyond, I think is part of that. People keep asking about funding the deal. The terms of the deal are actually in the press release, so I won't repeat it since I've covered it a few times. All right. I think that's— there's more here, but I got to hop. But anyway, I hope this was helpful. We'll learn more from the company and I'm sure research analysts are going to start writing about it. They're probably talking to people now, but yeah, interesting day. We'll see. We'll see a lot of, I think, for folks, there's obviously additional risk to a degree, and it's going to be something that people need to digest and hear from management on how they articulate the development of this program and how they see the long term. But yeah, thanks everyone everyone for joining, and we'll talk again soon. Take care. [00:44:06] Speaker D: Thanks for listening to the AST SpaceMobile Podcast. If you enjoyed this episode and you'd like to help support the podcast, please share it with others, post about it on social media, or leave a rating and review. To catch all the latest news about AST SpaceMobile, Make sure to subscribe. Thanks again, and I'll see you next time. Listen. [00:44:44] Speaker A: Mmm, waffles. Are you ever shopping online and suddenly a discount that helps you save pops up? It makes your day, sometimes even your week. Want that feeling month after month? Well, new customers who save by switching their home and auto insurance to Progressive save hundreds. Cue your happy dance. Get your quote today at progressive.com. Progressive Casualty Insurance Company affiliates and other insurers not available in all states. [00:45:11] Speaker E: What's the secret to being a great host this season? Keeping things deliciously simple, like mixing Simply Cranberry into a festive of drink as guests arrive, or serving up a warm mug of Simply Apple on a chilly night. That means less time behind the scenes and more time in the moment with everyone. Crafted with real fruit, Simply juices and fruit drinks make any holiday drink effortless, inviting, and completely delicious. Simply. Say yes to simple.
GUID: 4a1ceffe-f552-44bb-bc1b-f0272e274d04
· Audio source
· Model: claude-cli/claude-sonnet-5
· Processed: 2026-11-07T13:07:14+00:00